Citrix SD-WAN Platforms

Preparing for Installation

Before you install your new appliance, carefully unpack your appliance and make sure that all parts were delivered. After you are satisfied that your appliance has been delivered to your expectations, verify that the location where the appliance is installed meets temperature and power requirements and that the server cabinet or floor-to-ceiling cabinet is securely bolted to the floor and has sufficient airflow.

Only trained and qualified personnel should install, maintain, or replace the appliance, and efforts should be taken to ensure that all cautions and warnings are followed.

Preparing for Installation

In this article