Dependent component upgrade to 9.3.5 without working Virtual WAN deployment

  1. After the Virtual WAN upgrade is complete, perform Change Management once again, but this time the upload file would be of single step upgrade package with ns-sdw-sw-9.3.5.23.zip.

    localized image

  2. After upload is completed, the file is processed for any issues.

    localized image

  3. After the uploaded file is processed based on the configuration software for applicable models are uploaded to inbox as shown below.

    localized image

  4. Click Stage Appliances to proceed with further steps as shown below.

    localized image

  5. License agreement page is prompted when the user acceptance page is displayed.

    localized image

  6. After accepting and clicking OK, user is redirected to Appliance staging page which shows the status for Preparing and Staging the packages for the concerned branches.

    localized image

    localized image

  7. After transfer is completed, user clicks Next and is redirected to Activation page for further actions.

    localized image

  8. After completion of activation action in Change Management, the user is redirected to Local Change Management page as the upgrade is being done for the very first time on the MCN and no branches are yet bootstrapped to the network.

    localized image

    localized image

    localized image

  9. On completion of Local Change Management activation, user can go to Change Management page and download local change management package for corresponding branches from active hyperlink under ‘Download Package’ column.

    localized image

  10. Login to the corresponding branch which needs to be bootstrapped into the network and navigate to Local Change Management page and upload the local change management package that was downloaded from MCN for this branch.

    localized image

  11. After file to path is chosen to be uploaded click upload and a upload status progress bar appears showing the status of upload as seen below.

    localized image

  12. After upload is completed, you will receive a message saying Upload Complete. Now click Next.

    localized image

  13. You are redirected to the activation page where you can choose to activate staged software or cancel as shown below.

    localized image

  14. Clicking Activate Staged, the user confirmation is asked to proceed.

    localized image

  15. After accepting the message, an activation countdown is started with 180s as shown below.

    localized image

  16. On completion of countdown a message is displayed, as stating Activation Complete. The appliance change process has completed, and you can click Done.

    localized image

  17. You can enable SD-WAN service and see that virtual paths are up between the branch and MCN.

Dependent component upgrade to 9.3.5 without working Virtual WAN deployment