This content has been machine translated dynamically.
Dieser Inhalt ist eine maschinelle Übersetzung, die dynamisch erstellt wurde. (Haftungsausschluss)
Cet article a été traduit automatiquement de manière dynamique. (Clause de non responsabilité)
Este artículo lo ha traducido una máquina de forma dinámica. (Aviso legal)
此内容已经过机器动态翻译。 放弃
このコンテンツは動的に機械翻訳されています。免責事項
이 콘텐츠는 동적으로 기계 번역되었습니다. 책임 부인
Este texto foi traduzido automaticamente. (Aviso legal)
Questo contenuto è stato tradotto dinamicamente con traduzione automatica.(Esclusione di responsabilità))
This article has been machine translated.
Dieser Artikel wurde maschinell übersetzt. (Haftungsausschluss)
Ce article a été traduit automatiquement. (Clause de non responsabilité)
Este artículo ha sido traducido automáticamente. (Aviso legal)
この記事は機械翻訳されています.免責事項
이 기사는 기계 번역되었습니다.책임 부인
Este artigo foi traduzido automaticamente.(Aviso legal)
这篇文章已经过机器翻译.放弃
Questo articolo è stato tradotto automaticamente.(Esclusione di responsabilità))
Translation failed!
Dependent component upgrade to 9.3.5 without working Virtual WAN deployment
-
After the Virtual WAN upgrade is complete, perform Change Management once again, but this time the upload file would be of single step upgrade package with ns-sdw-sw-9.3.5.23.zip.
-
After upload is completed, the file is processed for any issues.
-
After the uploaded file is processed based on the configuration software for applicable models are uploaded to inbox as shown below.
-
Click Stage Appliances to proceed with further steps as shown below.
-
License agreement page is prompted when the user acceptance page is displayed.
-
After accepting and clicking OK, user is redirected to Appliance staging page which shows the status for Preparing and Staging the packages for the concerned branches.
-
After transfer is completed, user clicks Next and is redirected to Activation page for further actions.
-
After completion of activation action in Change Management, the user is redirected to Local Change Management page as the upgrade is being done for the very first time on the MCN and no branches are yet bootstrapped to the network.
-
On completion of Local Change Management activation, user can go to Change Management page and download local change management package for corresponding branches from active hyperlink under ‘Download Package’ column.
-
Login to the corresponding branch which needs to be bootstrapped into the network and navigate to Local Change Management page and upload the local change management package that was downloaded from MCN for this branch.
-
After file to path is chosen to be uploaded click upload and a upload status progress bar appears showing the status of upload as seen below.
-
After upload is completed, you will receive a message saying Upload Complete. Now click Next.
-
You are redirected to the activation page where you can choose to activate staged software or cancel as shown below.
-
Clicking Activate Staged, the user confirmation is asked to proceed.
-
After accepting the message, an activation countdown is started with 180s as shown below.
-
On completion of countdown a message is displayed, as stating Activation Complete. The appliance change process has completed, and you can click Done.
-
You can enable SD-WAN service and see that virtual paths are up between the branch and MCN.
Share
Share
In this article
This Preview product documentation is Cloud Software Group Confidential.
You agree to hold this documentation confidential pursuant to the terms of your Cloud Software Group Beta/Tech Preview Agreement.
The development, release and timing of any features or functionality described in the Preview documentation remains at our sole discretion and are subject to change without notice or consultation.
The documentation is for informational purposes only and is not a commitment, promise or legal obligation to deliver any material, code or functionality and should not be relied upon in making Cloud Software Group product purchase decisions.
If you do not agree, select I DO NOT AGREE to exit.